International EV charging project support
Evaluate compact, multi-output and modular DC fast-charging configurations for sites that require shorter charging sessions and higher daily utilization.
Where this solution fits
Urban fast-charging sites
Project planning, equipment selection and configuration coordination for this operating context.
Highway and travel locations
Project planning, equipment selection and configuration coordination for this operating context.
Commercial charging hubs
Project planning, equipment selection and configuration coordination for this operating context.
Key project considerations
- Target power and vehicle voltage range
- Number of simultaneous charging outputs
- Grid capacity and demand profile
- Cooling, enclosure and installation planning
Relevant charging equipment
40kW Compact DC Fast Charger
Review the published product overview and verified specification set.
160kW Four-Output DC Fast Charger
Review the published product overview and verified specification set.
240kW Dual-Output DC Fast Charger
Review the published product overview and verified specification set.
60–600kW Modular DC Fast Charger
Review the published product overview and verified specification set.
Plan your charging project
Send the site, power, connector, quantity and operating requirements. CowinLink Energy will coordinate equipment selection and the project technical scope.
Project planning
From requirements to an equipment plan
Define the use case
Confirm the application, operating environment and required outcome.
Review technical inputs
Check capacity, power, process, interfaces, utilities and constraints.
Coordinate the scope
Align equipment configuration, documents, delivery responsibilities and timeline.
Discuss your project
Send the application, destination, quantity or output target, key technical requirements and timeline.
