International EV charging project support
Coordinate charging equipment for fleet depots and public networks using the vehicle mix, route schedule, bay turnover and expansion plan as the selection baseline.
Where this solution fits
Fleet depots
Project planning, equipment selection and configuration coordination for this operating context.
Public charging networks
Project planning, equipment selection and configuration coordination for this operating context.
Municipal and shared charging sites
Project planning, equipment selection and configuration coordination for this operating context.
Key project considerations
- Fleet duty cycle and return-to-base windows
- Simultaneous charging demand
- Bay utilization and cable reach
- Maintenance access and future expansion
Relevant charging equipment
160kW Four-Output DC Fast Charger
Review the published product overview and verified specification set.
240kW Dual-Output DC Fast Charger
Review the published product overview and verified specification set.
60–600kW Modular DC Fast Charger
Review the published product overview and verified specification set.
Plan your charging project
Send the site, power, connector, quantity and operating requirements. CowinLink Energy will coordinate equipment selection and the project technical scope.
Project planning
From requirements to an equipment plan
Define the use case
Confirm the application, operating environment and required outcome.
Review technical inputs
Check capacity, power, process, interfaces, utilities and constraints.
Coordinate the scope
Align equipment configuration, documents, delivery responsibilities and timeline.
Discuss your project
Send the application, destination, quantity or output target, key technical requirements and timeline.
