Practical buyer resources
Technical Resources
Use these guides to prepare better Battery PACK equipment and EV charging project requirements before requesting a proposal.
Guides and tools
Battery PACK Assembly Process
Battery PACK production typically moves from incoming-cell inspection and sorting through insulation, grouping, welding, BMS integration, enclosure assembly and end-of-line testing.
Cell Sorting Before Battery PACK Assembly
Cell sorting reduces variation within a group. The correct method depends on chemistry, cell history, PACK design and quality requirements—not one universal threshold.
OCV vs Internal Resistance Testing for Battery Cells
OCV and internal resistance answer different screening questions. They are often used together before PACK assembly, with limits defined by the cell and project quality plan.
Battery PACK Production Line Planning Checklist
A useful line proposal starts with stable input data. Use this checklist before requesting equipment selection or a production-line quotation.
EV Charging Site Planning Checklist
Match charger selection to the site operating model. Vehicle demand, dwell time and available power should be defined before choosing charger ratings.
Frequently Asked Questions
Direct answers about quotations, configurations, delivery coordination and project information.
Technical Document Request
Request available manuals, drawings or project-specific technical documents.