Technical guide

Cell Sorting Before Battery PACK Assembly

Cell sorting reduces variation within a group. The correct method depends on chemistry, cell history, PACK design and quality requirements—not one universal threshold.

Key planning points

OCV

Open-circuit voltage is a quick screening input but does not by itself describe capacity or full dynamic behavior.

Internal resistance

IR helps identify electrical variation that can influence heat and voltage behavior under load.

Capacity and aging history

Projects with tighter consistency needs may require capacity grading or controlled aging information.

Traceability

Define barcode, channel, result and lot data that must follow the cell into module and PACK records.

Equipment selection

Specify cell format, channels, range, accuracy, loading method, takt time and data interface before quotation.

Use this guide in a real project

Share the available drawings, specifications, target output or site conditions. CowinLink Energy will use the confirmed inputs to coordinate a suitable equipment or charging proposal.

Request Technical Recommendation

Scroll to Top